Original stairs

2

Barry welding stair slights

3

Original stairs partway through demolition

4

Making stair void safe

5

Hauling up edge beam to stair opening

6

Installing edge beam

7

Installing staircase primary structure

8

Installing first edge of stair

9

Second flight propped, awaiting primary structure

10

Hoisting flight three into place

11

 

12

Primary structure in place

13

Fine tuning primary structure position

14

First floor stairs, awaiting second flight

15

 

16

First view of flights in place

17

View of lifting gantry

 

19

Handrails installed

21

Starting to look like the drawings

20

22

Inaugural users 

23

Internal wall insulation

24

Barry welding finishing touches

25

Tidying up steelwork

26

Counter sinking

26a

View from entrance lobby

27

View from first floor

27a

29

View from second floor

32a

stair